Building and timber pest in a single visit under AS 4349.1 and AS 4349.3, covering the structure and the conditions around it that invite termites in.
The building component is reported under AS 4349.1 and the timber pest component under AS 4349.3. The timber pest component records whatever evidence is present on the day. It is not a treatment, and it does not certify the property as free of pests.
0 checkpoints across 0 areas on a standard Rockbank building and pest inspection. Anything locked, sealed or covered by stored goods on the day is recorded as not inspected. We do not pass work we could not reach.
From a building and pest inspection at Bacchus Marsh, further west along the corridor.





New Construction Stage Inspections Seven checks through a Rockbank build, each timed before the work disappears behind the next trade.
Pre-Handover (PCI) Inspections The inspection before keys, where the water items get chased first.
Pre-Purchase Building Inspections An established property assessed under AS 4349.1, with cracking measured rather than described.
Defect Investigation Reports Comparing the failure with what the engineering called for, so the discussion turns on the drawing. Instant online pricing, or talk to the booking team on 1300 471 805.
No inspection can, and one that claims to should be treated carefully. AS 4349.3 is an inspect and report standard covering evidence visible on the day and the conditions that raise the risk.
Because a crack is both a structural indicator and an access route. Termites travel through gaps that look cosmetic from outside.
Walls are not opened, stored goods are left where they are, unsafe spaces are not entered, and electrical, gas and plumbing are not tested. Any treatment, and the warranty on it, is a licensed pest controller's work.