Mouldings, doors and joinery are in and the painter is next, so anything found now is fixed before paint.
Fixing stage in this corridor overlaps heavily with waterproofing, since the wet areas are finished around the same time and the drains are still open to inspect.
Annotated findings from Fixing inspections on Rockbank builds. Client addresses withheld.



1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, with steel and formwork open
3FrameOnce frame and trusses are up and the roof is on, before sarking
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
6WaterproofingAfter the membrane is applied and cured, before tiling
7Pre-handover (PCI)About a week before practical completionInstant online pricing, or talk to the booking team on 1300 471 805.
In Victoria they are usually combined as fixing including waterproofing, and we can attend for either or both.
Alignment, gaps, finish and completeness of the internal joinery work, alongside the wet areas if they are at the same point.
The Guide to Standards and Tolerances 2015 for alignment, gaps and finish.
Appliances are not tested, circuits are not made live and nothing is commissioned.
Around two hours for a typical home in this corridor.
If budget allows. Items caught before paint are cheap to put right.