The last inspection where the builder carries the cost of putting things right.
Handover findings in this corridor cluster around water: a box gutter overflow that cannot perform, flashings sitting on the face of the cladding instead of behind it, and a water stop left out from under the shower screen.

Annotated findings from Pre-handover (PCI) inspections on Rockbank builds. Client addresses withheld.




1Bored piersAfter boring and cage placement, before concrete
2Slab pre-pourThe day before the pour, with steel and formwork open
3FrameOnce frame and trusses are up and the roof is on, before sarking
4Lock-up (pre-plaster)After roof, cladding and external doors, before plaster
5FixingAfter mouldings, doors and joinery, before painting
6WaterproofingAfter the membrane is applied and cured, before tilingInstant online pricing, or talk to the booking team on 1300 471 805.
That the high capacity overflow cannot do its job. A box gutter blockage then has nowhere to go except into the roof and the ceiling below.
So water running down the cladding passes over it. Sitting on the face, it directs water into the wall instead of out of it.
Immediately. You have the most leverage before putting your name to practical completion.
Yes, a reinspection runs through the list before settlement.
Live circuits, pressure tests, commissioning, appliance and garage door safety checks, and anything concealed.
Two to three hours as a rule, more on a double storey.